Phase 1
Site Survey
During the site visit, we document physical and electrical conditions that impact system design and installation.
-
Roof Condition and Measurements
Verify roof dimensions, material, pitch, usable installation areas, and obstructions.
-
Electrical System Inspection
Inspect panel, meter location, grounding, breaker space, and electrical capacity.
-
Equipment Locations
Plan placement of inverters, batteries, disconnects, and conduit paths.
-
Structural Requirements
Evaluate framing, mounting approach, attic access, and structural constraints.
-
Site and Construction Planning
Review setbacks, trenching needs, utility access, HOA requirements, and obstacles.